Road construction & maintenance
Old Fort Erosions Repairs and Drainage Improvements
- Location
- Fort St. John, BC
- Client
- BC HydroErosion control and specialized drainage stabilization
- Project value
- $1.37M
- Duration
- September 2022 to May 2023.

The work
Project scope.
- Constructed to BC Hydro Specifications.
- Site clearing and grubbing; Type D organic stripping, onsite re-use or disposal;
- Excavation for riprap pad at gully inlet;
- Install three multi-tiered gabion structures c/w non-woven geotextile and bituminous membranes to prevent further erosion in streambed;
- Supply and place two 25 kg riprap diversion ditch blocks and supply and place one 50 kg and one 100 kg diversion channel;
- Abandon 800 mm culvert – infill with grout; supply and install 750 mm CSP Culvert;
- Regrade ditches and spillways;
- Remove concrete roadside barriers and chain link fence at project initiation and replace at project completion; and,
- Supply and place erosion matting and reseed.
Our role
Roles & responsibilities.
- Preconstruction meeting with the Owner;
- Weekly meetings and progress updates;
- Updates when required to the Owner regarding technical or site issues or discrepancies encountered. Solutions provided as options when applicable;
- Quality management updates and quality control check sheets of construction progress and material installs;
- Coordination of subcontractors to complete project works;
- Coordination of third-party utilities such as BC Hydro, Pacific Northern Gas, TELUS, Shaw, etc.;
- Site inspections with the Owner; and,
- Final walk through and completion of deficiencies in a timely manner.
Subcontractors
N/A
On the ground.
07 project photographs