Old Fort Erosions Repairs and Drainage Improvements

Location
Fort St. John, BC
Client
BC HydroErosion control and specialized drainage stabilization
Project value
$1.37M
Duration
September 2022 to May 2023.
BC Hydro Old Fort Road Drainage Improvements

The work

Project scope.

  • Constructed to BC Hydro Specifications.
  • Site clearing and grubbing; Type D organic stripping, onsite re-use or disposal;
  • Excavation for riprap pad at gully inlet;
  • Install three multi-tiered gabion structures c/w non-woven geotextile and bituminous membranes to prevent further erosion in streambed;
  • Supply and place two 25 kg riprap diversion ditch blocks and supply and place one 50 kg and one 100 kg diversion channel;
  • Abandon 800 mm culvert – infill with grout; supply and install 750 mm CSP Culvert;
  • Regrade ditches and spillways;
  • Remove concrete roadside barriers and chain link fence at project initiation and replace at project completion; and,
  • Supply and place erosion matting and reseed.

Our role

Roles & responsibilities.

  • Preconstruction meeting with the Owner;
  • Weekly meetings and progress updates;
  • Updates when required to the Owner regarding technical or site issues or discrepancies encountered. Solutions provided as options when applicable;
  • Quality management updates and quality control check sheets of construction progress and material installs;
  • Coordination of subcontractors to complete project works;
  • Coordination of third-party utilities such as BC Hydro, Pacific Northern Gas, TELUS, Shaw, etc.;
  • Site inspections with the Owner; and,
  • Final walk through and completion of deficiencies in a timely manner.

Subcontractors

N/A