Naache Commons – Phase 1

CLIENT
Petrocom
VALUE
$3M
DURATION
May 2024 – November 2025

Project Scope

  • Equipment mobilization/demobilization (x1) assuming work will be completed within one continuous operation without any interruptions or delays.
  • Earthworks for subgrade preparation based on the quantities provided.
    • Site stripping and any surplus excavated material from common excavation to be disposed of in a stockpile located on-site. Excludes any off-site trucking and dumping of surplus soils.
    • Supply and installation of culvert and headwalls at 116 Street driveway entrance.
    • Excavation and grading for the storm water detention pond. Excludes riprap lining as no details have been provided. Excludes supply and install of any perimeter fencing.
  • Earthworks for Import & Place Engineered Fill
    • Clean pit run to be used based on survey quantities at $61.50/m3
  • Earthworks for Remove & Replace Unsuitable Subgrade (Optional Work)
    • Clean pit run to be used based on survey quantities at $80/m3.
  • Onsite water servicing works based on the quantities provided.
    • Supply and installation of 100mm, 200mm and 250mm dia. watermain along with associated appurtenances.
    • Supply and installation of Water Meter & DCVA Chambers.
    • Assumes native trench backfill with exception for pipe bedding zone.
    • Assumes any surplus excavated material from trench excavations to be disposed of in a stockpile located on-site.
  • Onsite sanitary sewer servicing works based on the quantities provided.
    • Supply and installation of 200mm dia. sanitary sewer piping along with associated 1,050mm dia. precast manholes.
    • Includes connection to existing manhole on 105 Avenue.
    • Supply and installation of catch basins and leads.
    • Assumes native trench backfill with exception for pipe bedding zone.
    • Assumes any surplus excavated material from trench excavations to be disposed of in a stockpile located on-site.
  • Onsite storm piping works based on the quantities provided.
    • Supply and installation of 200mm, 250mm, 300mm, and 375mm dia. storm piping along with associated 1,050mm dia. precast manholes.
    • Supply and installation of 1,200mm dia. oil and grit separators.
    • Supply and installation of catch basins and leads.
    • Assumes native trench backfill with exception for pipe bedding zone.
    • Assumes any surplus excavated material from trench excavations to be disposed of in a stockpile located on-site.

Roles & Responsibilities

Challenge

All the different trades on site, working alongside other trades and contractors

ACL Solution:

Develop a schedule and execute accordingly

Highlight / Achievement:

Finished project on time despite engineering modifications

Team Size on Site:

Superintendent, operators, labourers, 8-10 people

Job done safely with no incidents and done on schedule

Construction progress 1
Construction progress 2

Subcontractor(s)

N/A

Naache-Commons project image