Project

The Harlequin

Fort St. John, BC

CLIENT
WCPG Construction Ltd
VALUE
$1.2M
DURATION
May 2024 - June 2025

Project Scope

  • Site Preparation, stripping and removing excess materials offsite
  • Materials required for building/footing backfill to be stockpiled onsite
  • Building Earthworks
  • Bulk building excavation and offsite disposal of surplus material
  • Detailed pad and strip footing foundation excavation
  • Backfilling of foundation with common/native material
  • Slab on grade preparation including supply of 19 mm crush and 6 mil polyethylene sheeting
  • Site Earthworks
  • Parkade ramp excavation and offsite disposal
  • Ramp preparation including subgrade, 19 mm crush and 6 mil polyethylene sheeting prep
  • Subgrade and sub-base preparation for exterior building parking lot area
  • Underground utilities
  • Water servicing and hydrant, sanitary sewer servicing
  • Storm sewer piping, concrete box culverts and associated manholes
  • Storm sewer flow control device and oil grit separator supply and installation
  • Tie-ins to existing utilities and backfill to original condition included.
  • 150 mm thick base gravel installed and prepped for curb, gutter and asphalt

Roles & Responsibilities

  • Pre-Construction meeting
  • Construct to engineer and owner design
  • Weekly meetings and progress updates
  • Updates when required to the Owner regarding technical or site issues or discrepancies encountered, provide solutions if required
  • Quality management updates and quality control check sheets of construction progress and material installs
  • Coordination of subcontractors to complete project works
Construction progress 1
Construction progress 2

Subcontractor(s)

N/A

The Harlequin construction site
The Harlequin construction site
The Harlequin construction site