Project
Reclamation & Remediation- Fort St. John and surrounding areas
Fort St. John, BC
CLIENT
BCER.; ACL - Subcontractor to Prime Contractors Atkin Realis-formally SNC Lavalin, Harvest Energy, Oakridge, Flint Energy/Clear Stream, Elm, Prospect and Purnell
ACL Civil Earthworks for BCER: Orphan Site Management
VALUE
$5-10M
DURATION
2019 – Current
Project Scope
- Constructed to project specifications.
- Provide and mobilize reliable equipment and operators.
- Remedial excavations.
- Installation of safety fencing if required around the excavation site.
- Hauling contaminated materials from the site with our LT hazardous Waste License to approved landfills.
- Transportation of backfill to site from approved site deemed by Prime Contractor that
meets their standards.
Roles & Responsibilities
- Preconstruction meeting with the Main Contractors.
- Updates when required to the Main Contractor regarding technical or site issues or discrepancies encountered. Solutions are provided as options when applicable.
- Assist with, when required by client with Quality management updates and quality control check sheets of construction progress and material installations.
- Site inspections.
- Final walk-through and approved work prior to demobilization of equipment on-site.
- Assist with sampling of materials on site to confirm all contaminates have ben excavated.
BCER – Spreading backfill to complete reclaim of site.
BCER – Site excavation with installation of construction fencing as required.
Subcontractor(s)
Material Hauling by approved LT license carriers:
- HCL Industries
- Mattrick Holding
- Ditmarsia Holding
- Kosick Aggregates
- Northern Vac Services