Project
Peterson’s Crossing Slide Repairs
Fort St. John, BC
CLIENT
Dawson Road Maintenance / Ministry of Transportation and Infrastructure (MoTI)
VALUE
$500K
DURATION
August 2023 - September 2023
Project Scope
- Constructed to BC Hydro Specifications
- Slope stabilization using EPS foam blocks
- Site clearing and grubbing; Type D organic stripping
- Excavation for riprap pad at gully inlet
- Install three multi-tiered gabion structures, non-woven geotextile and bituminous membranes to prevent further erosion in streambed
- Supply and place two 25 kg riprap diversion ditch blocks and supply and place one 50 kg and one 100 kg diversion channel
- Abandon 800 mm culvert – infill with grout; supply and install 750 mm CSP Culvert
- Regrade ditches and spillways
- Remove concrete roadside barriers and chain link fence at project initiation and replace at project completion
- Supply and place erosion matting and reseed
Roles & Responsibilities
- Preconstruction meeting with the Owner
- Weekly meetings and progress updates
- Updates when required to the Owner regarding technical or site issues or discrepancies encountered, provide solutions if required
- Quality management updates and quality control check sheets of construction progress and material installs
- Coordination of subcontractors to complete project works
- Coordination of third-party utilities such as BC Hydro, Pacific Northern Gas, TELUS, Shaw, etc.
- Site inspections with the Owner
- Final walk through after completion
Subcontractor(s)
N/A
Let’s get your project off the ground!
From site preparation and underground utilities to road building and large-scale infrastructure work, our team will work with you to deliver practical solutions that align with your goals, timeline, and budget.
Start a Conversation