Old Fort Erosions Repairs and Drainage Improvements

Fort St. John, BC

CLIENT
BC Hydro
Erosion control and specialized drainage stabilization
VALUE
$1.37M
DURATION
September 2022 to May 2023.

Project Scope

  • Constructed to BC Hydro Specifications.
  • Site clearing and grubbing; Type D organic stripping, onsite re-use or disposal;
  • Excavation for riprap pad at gully inlet;
  • Install three multi-tiered gabion structures c/w non-woven geotextile and bituminous membranes to prevent further erosion in streambed;
  • Supply and place two 25 kg riprap diversion ditch blocks and supply and place one 50 kg and one 100 kg diversion channel;
  • Abandon 800 mm culvert – infill with grout; supply and install 750 mm CSP Culvert;
  • Regrade ditches and spillways;
  • Remove concrete roadside barriers and chain link fence at project initiation and replace at project completion; and,
  • Supply and place erosion matting and reseed.

Roles & Responsibilities

  • Preconstruction meeting with the Owner;
  • Weekly meetings and progress updates;
  • Updates when required to the Owner regarding technical or site issues or discrepancies encountered. Solutions provided as options when applicable;
  • Quality management updates and quality control check sheets of construction progress and material installs;
  • Coordination of subcontractors to complete project works;
  • Coordination of third-party utilities such as BC Hydro, Pacific Northern Gas, TELUS, Shaw, etc.;
  • Site inspections with the Owner; and,
  • Final walk through and completion of deficiencies in a timely manner.
Construction progress 1
Old Fort, installation of gabion baskets in stream bed
Construction progress 2
Old Fort, gabion baskets and riprap installed in stream bed and erosion control mats placed

Subcontractor(s)

N/A