Bluegrave Scour Repair & Bank Protection

Bluegrave Creek – Mile 95 Alaska Highway

CLIENT
Dawson Road Maintenance
VALUE
$300K
DURATION
July 2025 – October 2025

Project Scope

  • Excavate and place fill
  • Beaver Dam removal
  • Prepare the subgrade of the bank protection
  • Placement of rip rap protection along the prepared grade
  • Isolation included the installation of meter bags filled with granular material and a polyethylene sheet along the project footprint to create a passive diversion
  • Passive diversion, fish salvage in the project footprint and site dewatering
  • Backfilling with approved material
  • Install rip rap to shore and protect the new embankment fill

Roles & Responsibilities

  • Pre-Construction meeting & pre-job hazard assessment
  • Construct to engineer and owner design
  • Weekly meetings and progress updates
  • Updates when required to the Owner regarding technical or site issues or discrepancies encountered, provide solutions if required
  • Quality management updates and quality control check sheets of construction progress and material installs
  • Coordination of subcontractors to complete project works

Sustainability Certifications

Environmental monitoring daily

 

Construction progress 1
Construction progress 2

Subcontractor(s)

Metro Testing & Engineering, Poorboy Trucking, Mountainview Safety, HCL Industries