Project
PRRD Geotube Site Preparation
Charlie Lake, Kelly Lake and Rolla
CLIENT
Peace River Regional District (PRRD)
Site Preparation and Berm Building for Geotubes (Chalie Lake, Kelly Lake and Rolla)
VALUE
$66K
DURATION
August 2024
Project Scope
- Construct laydown areas at all 3 locations varying in size.
- Surround laydown(s) with berms for containment of 3’ tall and 10’ wide.
- Key in developed berm with top of existing berm to prevent liner from blowing or ripping.
Roles & Responsibilities
- Preconstruction meeting with the Owner;
- Updates when required to the Owner regarding technical or site issues or discrepancies encountered. Solutions provided as options when applicable;
- Coordination of subcontractors to complete project works if necessary;
- Coordination of third-party utilities such as BC Hydro, Pacific Northern Gas, TELUS, Shaw, etc.;
- Site inspections with the Owner; and,
- Final walk through and completion of deficiencies in a timely manner.
[insert description]
[insert description]
Subcontractor(s)
N/A
Let’s get your project off the ground!
From site preparation and underground utilities to road building and large-scale infrastructure work, our team will work with you to deliver practical solutions that align with your goals, timeline, and budget.
Start a Conversation