Lillooet & Merrit (Highway 1, 5 & 8)

CLIENT
Yellowhead Road & Bridge Ltd / MoTI
VALUE
$5.9M
DURATION
November 2021 - March 2022

Project Scope

  • Road washout repairs
  • Repair washed out road shoulders and widen roads
  • Re-establishing the river channel and stockpile rock
  • Spread 3″ Minus along main roads
  • Armoring bridge abutments
  • Producing and hauling rip rap and placing at bridge approaches and under bridges
  • Trucking combinations hauling rock
  • Plow snow when necessary
  • Clean out ditches, clear debris

Roles & Responsibilities

Challenge:

Heavy flowing water, dangerous conditions, keeping operators safe being so far away from head office

Highlight / Achievement:

Helping rebuild important infrastructure along BC Numbered Highways

Team Size on Site:

15-20 operators and truck drivers

Construction progress 1
Construction progress 2

Subcontractor(s)

N/A

Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs Road Repairs
Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs
Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs
Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs
Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs
Excavators loading rock ACL Construction Fort St. John Flood Mitigation Repairs
Excavators loading rock ACL Construction Fort St. John

Let’s get your project off the ground!

From site preparation and underground utilities to road building and large-scale infrastructure work, our team will work with you to deliver practical solutions that align with your goals, timeline, and budget.

Start a Conversation
Share this on: