A.C.L. Construction completed a bridge scour and erosion mitigation project between September and October of 2023. The project included placement of riprap at the bridge abutment to mitigate bridge scour and installation of bank armoring in the form of a granular fill reinforced with geosynthetics to stabilize the sloughed upstream south bank.