A.C.L. Construction completed a slope stability project at Peterson’s Crossing in August of 2023. The project consisted of the installation of a concrete lock block and EPS (Expandable Polystyrene) block retaining wall and partial road base to stabilize the road. To complete the project, utilities required relocation, sloughed material was excavated and removed, aggregates, lock blocks and EPS blocks were installed.