A.C.L. Construction L.T.D.

Old Fort

This clean energy project was completed for BC Hydro at Site C. The project was adjacent to the North Bank of Old Fort Road headed into the Site C Project. This large drainage diversion project included ditching, ditch blocks, gabion rock drop structures multiple drainage diversions as well as erosion sediment controls. This was a big local project we were pleased to take the lead on.