The Old Fort Erosions Repairs and Drainage Improvements were completed September to May of 2023. The job required installing an excavated riprap gully inlet, building and placement of a multi-tier gabion structures with placement of textiles and bituminous membranes to prevent further erosion in streambed. We also abandoned a 800m culvert, and installed new CSP 750mm culvert for drainage. Ditches and spillways were all regraded and placement of new erosion matting and seed was laid.