This clean energy project was completed for BC Hydro at Site C. The project was adjacent to the North Bank of Old Fort Road headed into the Site C Project. This large drainage diversion project included ditching, ditch blocks, gabion rock drop structures multiple drainage diversions as well as erosion sediment controls. This was a big local project we were pleased to take the lead on.