05 Drainage Improvements & Yard Upgrades

Completed for PCL Constructors on behalf of BC Hydro, this project included the removal and disposal of contaminated soils, installation of manholes and catch basins and tie into City infrastructure to facilitate regrading and drainage of the storage yard.  A challenging project to meet specifications and requirements during the shoulder season of October/November.

03 Gravel Pit

In the spring of 2019, ACL developed and started producing gravel in the Mile 109 area of the Peace Region.  Our crushing and screening has produced various products that are readily available for use in the Oil & Gas industry as well as Ministry use.  Sieves and specifications are available upon request.

01 BCH PRES Transmission Line Construction

This project for BC Hydro included the construction of 39.2 kilometres of access roads and crane pads ahead of the transmission line installation from Site C to Groundbirch substation.  The construction included high-grade all-season roads, geo design roads in terrain stability areas and winter construction of high-grade roads across swamp and muskeg.  Pipeline crossings, culvert …

01 BCH PRES Transmission Line Construction Read More »