This project for BC Hydro included the construction of 39.2 kilometres of access roads and crane pads ahead of the transmission line installation from Site C to Groundbirch substation.  The construction included high-grade all-season roads, geo design roads in terrain stability areas and winter construction of high-grade roads across swamp and muskeg.  Pipeline crossings, culvert installations, erosion and sediment controls, as well as rip rap armouring of ditch lines and cut slopes, occurred concurrently with all operations.  The project was completed on schedule and on budget with zero incidents.